ENPTES Free trial

Playout, schedule and station automation

The vocabulary of a channel that runs by the clock, for people coming from live event production.

Short answer

Playout is the part of a TV or web channel that puts content on air in the right order and at the right time: recorded programs, commercials, idents and the switch to a live studio. The schedule is the list of what airs during the day, with the time of each item. Automation is the software that follows the schedule by the clock and puts each item on air without someone pressing a button for every one.

The main screen of NWK Live Production with Preview, Program and the status bar at the bottom
The main screen of NWK Live Production with Preview, Program and the status bar at the bottom
On this page
  1. What playout is
  2. The terms of a schedule
  3. Fixed times, filler and the clock
  4. What automation means
  5. Playout in NWK Live Production
  6. Related questions

What playout is

Production makes a program: cameras, cuts, graphics, audio. Playout delivers a channel: it takes finished items and puts one after the other on air, all day, with no gap between them. A live event ends when the show ends. A channel does not end, so something has to decide what airs next at every moment.

The terms of a schedule

TermWhat it means
Schedule, or gridThe list of everything that airs in a day, in order, with times and durations
Block and commercial breakA part of a program between two breaks, and the group of commercials that airs between blocks
Fixed timeAn item that must start at an exact time of day, such as the news at noon
FillerShort material that covers the time left before a fixed time: idents, promos, loops
As-run logThe record of what actually aired and at what time, used to prove that a commercial ran

Fixed times, filler and the clock

Programs rarely last exactly what the schedule says. Playout deals with the two possible errors.

  • The schedule is running early. The previous item ended before the next fixed time. Filler plays until that time. Without filler, the channel shows a still picture or black.
  • The schedule is running late. The previous item is still on air at the fixed time. Either the fixed item cuts in on time and the end of the previous one is lost, or the fixed item waits and starts late.

What automation means

ModeWho advances the schedule
AutomaticThe system, from one item to the next and at the fixed times
Assisted, or live assistThe system plays each item and waits for the operator to release the next one
ManualThe operator starts every item

Automatic mode is what lets a channel run at night with nobody in the room. How to keep an unattended channel on air is in build a 24/7 channel, and what a small station needs is in web TV and local TV.

Playout in NWK Live Production

NWK Live Production has the Scheduling Player, an input that plays a schedule of videos, images and live inputs, with fixed times, filler and stingers. It has three modes: Automatic, Assisted, which stops at the end of each item and waits for GO, and Manual. An item with a fixed time either cuts in on time or waits for the item on air to finish, and when the schedule is running early the filler plays until that time. A block has a header and an end, with the commercials between the two. See use the Scheduling Player.

Undated schedules are saved once and placed on days of the agenda, the Week button opens saved schedules by themselves on certain days and times, and the Player logs what aired and at what time, in one file per day. See plan schedules by day.

Related questions

What is the difference between playout and live production?

Live production creates a program in real time, cutting between cameras and adding graphics and audio. Playout puts finished items on air one after the other, by the clock, to keep a channel running all day.

What is filler in a broadcast schedule?

Filler is short material, such as idents, promos or loops, that plays when a program ends before the next fixed time.

What is an as-run log?

An as-run log is the record of what actually went on air and at what time, written by the playout system.

In the NWK help center

Written and reviewed by the NWK Live Production team (Setor 360 Tecnologia e Eventos Ltda). Published .

NWK has a Scheduling Player with fixed times, filler, commercial blocks, a weekly agenda and a report of what aired.

Try NWK free for 7 days