Short answer
To put live titles from Google Sheets on a stream, the title has to read a table: each column feeds one field of the title and each row is one person, one item or one result. In NWK Live Production, you paste the link of the Google Sheets spreadsheet, or the address of a JSON, XML or CSV file, into the title editor, choose which column fills each field and how often the program reads the data again. The text then updates by itself, row by row.

On this page
What a title linked to a table solves
A lower third typed by hand has three weak points: someone has to type it at the moment of the cut, nobody reviews the spelling, and the person who knows the right name is usually not the person at the computer.
With the title linked to a table, the list of names is written and reviewed before the event, by whoever knows it best. During the event the operator only chooses the row. When the content changes during the event, such as a result or a schedule, the person who updates the table does not need to touch the production computer.
Spreadsheet or file: which source to use
| Source | When it fits |
|---|---|
| Google Sheets spreadsheet | Another person edits the data, from another computer or a phone, while you operate |
| CSV file | A list that is ready before the event, exported from any spreadsheet program |
| JSON or XML address | The data comes from another system, such as a results or registration service that publishes a data address |
| File on the computer | The venue has no reliable internet, or the data is produced on the same machine |
A spreadsheet on the internet depends on the connection of the venue. If the event cannot wait for the network, keep a copy of the list as a file on the computer.
How to prepare the table
- Use the first row for the column names, such as Name and Role. Short, clear names make it easy to pick the right column later.
- Put one item per row, in the order of the event when there is one.
- Keep one piece of information per column. Name and role in the same cell cannot be sent to two different fields.
- Write the text exactly as it must appear: capital letters, accents and abbreviations included.
- Check the length of the longest name against the title on screen before the event.
How NWK links a title to the data
In NWK Live Production, titles are inputs: a lower third with name and role, a ticker, a LIVE badge, a clock or a center title. Open the title with ✎ (Edit text). In LIVE DATA (OPTIONAL), paste the Google Sheets link or the JSON, XML or CSV address, or click File… to use a .json, .xml, .csv or .txt file from the computer.
- In “every”, choose the interval between reads, from 2 to 600 seconds.
- Next to each field, choose which data column it comes from.
- Use ◀ and ▶ to move from one row to another.
After reading, the editor shows how many rows and columns it found and the time of the read. A field linked to a column becomes read-only, because the table is in charge; choose fixed text to type in that field again. The steps are in pull live data into a title, and the title types are in create a title or lower third.
When the data cannot be read
If NWK cannot read the source, the editor shows Could not read with the reason. If it had read the source before, the title keeps the last table, so a network failure in the middle of the event does not empty the title. Click Turn off to take the title off live data and go back to typed text.
Test the whole path in rehearsal: change a cell, wait for the interval and confirm the new text in the title. A sports score with its own clock and rules is a different tool; see the sports scoreboard in NWK.
Related questions
Can a live stream title read names from Google Sheets?
Yes, when the program can link a title to a table. In NWK Live Production, you paste the Google Sheets link into the title editor, choose which column feeds each field and move from row to row with the ◀ and ▶ buttons.
How often does the title read the data again?
In NWK Live Production you choose the interval between reads, from 2 to 600 seconds. A short interval suits data that changes during the event; a long one is enough for a list that is ready beforehand.
What happens to the title if the internet drops during the event?
In NWK Live Production, when a read fails the editor shows Could not read with the reason, and a title that had already read the source keeps the last table. For a venue with unstable internet, use a file on the computer as the source.
In the NWK help center
Written and reviewed by the NWK Live Production team (Setor 360 Tecnologia e Eventos Ltda). Published .
NWK links a title to a Google Sheets spreadsheet or to a JSON, XML or CSV file and reads it again every 2 to 600 seconds.
Try NWK free for 7 days

